检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖帅 Xiao Shuai(Hunan Communications Research Institute Co.Ltd.,Changsha 410015,China)
机构地区:[1]湖南省交通科学研究院有限公司,湖南长沙410015
出 处:《现代盐化工》2023年第2期79-81,共3页Modern Salt and Chemical Industry
摘 要:山区高速公路岩溶隧道地质条件复杂,对施工技术和设备要求高,工程施工环境风险大,风险等级高且随施工进度动态变化,导致施工风险防控难度大。以张桑高速建设项目为例,基于多层次模糊综合评价法对该项目黄香湾隧道岩溶区段的重大风险源开展施工安全动态风险评估,并提出有针对性的控制措施,实现风险的分级管控。同时,为其他复杂岩溶隧道风险评估提供参考。The geological conditions of karst tunnel in mountainous expressway are complex,the construction technology and equipment requirements are high,the construction environment is risky,the risk level is high and dynamically changes with the construction progress,leading to the difficulty of construction risk prevention and control.Taking the construction project of Zhang-Sang Expressway as an example,based on the multi-level fuzzy comprehensive evaluation method,the dynamic risk assessment of construction safety was carried out for the major risk source in the karst section of the Huangxiangwan Tunnel of the project,and targeted control measures were proposed to achieve hierarchical risk management and control.At the same time,it provides reference for risk assessment of other complex karst tunnels.
关 键 词:多层次模糊综合评价法 岩溶隧道 风险评估 风险管控
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.110.185