检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨举明[1] 郑亚飞[1] YANG Juming;ZHENG Yafei(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《路基工程》2023年第3期29-33,共5页Subgrade Engineering
摘 要:岩溶及岩溶水等不良地质是控制线路方案的主要工程地质问题。阐述沿江高铁宜昌至涪陵段主要工程地质问题及岩溶发育区对高速铁路工程的影响,并结合宜万铁路岩溶区经验教训,通过该项目岩溶发育区段地质选线案例,总结出山高壁陡的岩溶发育区高速铁路地质选线主要对策与措施。Karst and karst water and other unfavorable geological conditions are the main engineering geological problems to control the route plan.This paper describes the main engineering geological problems of the Yichang—Fuling section of Shanghai—Chongqing—Chengdu high-speed railway and the impact of the karst development area on the high-speed railway project.Combined with the experience and lessons of the karst area of the Yichang—Wanzhou railway,through the geological route selection case of the karst development area of the project,the main countermeasures for the geological route selection of the high-speed railway in the karst development area with high mountains and steep walls are summarized.
分 类 号:U21[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222