检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张璐 李洋[2] 穆海宝[2] 张大宁 张冠军[2] 韩彦华 ZHANG Lu;LI Yang;MU Haibao;ZHANG Daning;ZHANG Guanjun;HAN Yanhua(Power Research Institute of State Grid Shaanxi Electric Power Company Limited,Xi’an 710100,China;State Key Lab of Electrical Insulation and Power Equipment,Xi’an Jiaotong University,Xi’an 710049,China)
机构地区:[1]国网陕西省电力有限公司电力科学研究院,西安710100 [2]西安交通大学电力设备电气绝缘国家重点实验室,西安710049
出 处:《高压电器》2023年第6期147-153,共7页High Voltage Apparatus
基 金:国家自然科学基金青年基金(52107165);国网陕西省电力有限公司科技项目(5226KY23000U)。
摘 要:油纸绝缘套管作为变电站内极为重要的电力设备之一,其绝缘状态对于电力系统的安全稳定运行至关重要。频域介电谱法可实现套管绝缘状态的无损检测,但传统扫频测试耗费时间长,为频域介电谱的现场应用带来不便。文中提出一种冲击电压激励下变压器套管介电响应快速测量方法,利用冲击电压信号中包含的丰富频率分量作为激励信号,获取套管末屏响应电流并进行数据处理与计算,从而得到频域介电响应信息。文中基于扩展德拜模型,搭建冲击电压激励下介电响应仿真平台,并利用任意波形发生器、高压功率放大器等设备搭建实验测试平台,验证了冲击电压激励下介电响应快速测量方法的可行性与准确性,对于缩短变压器停电检修时间窗口,提高现场套管绝缘状态诊断效率具有重要意义。The insulation state of oil-paper insulating bushing,as one of the most important power equipment in substations,is very important to safe and stable operation of power system.The frequency domain dielectric spectroscopy can achieve the non-destructive test of the insulation state of the bushing.However,the traditional sweep frequency test takes a long time and brings inconvenience to the field application of the frequency domain dielectric spectroscopy.In this paper,a kind of fast measurement method for dielectric response of transformer bushings under impulse voltage excitation is proposed.The abundant frequency components contained in impulse voltage signals is used as excitation source to obtain the response current at the end screen of the bushing and perform data processing and calculation,thus obtaining response information of the frequency domain spectroscopy.Based on the extended Debye model in this paper,the simulation platform for dielectric response under impulse voltage excitation is set up and such equipment as arbitrary waveform generators and high-voltage power amplifiers are used to set up an experimental test platform to verify the feasibility and accuracy of the fast measurement method of dielectric response under impulse voltage excitation.The work in this paper is of great significance for shortening the power-off time window for transformer power maintenance and improving the diagnosis efficiency of bushing insulation status on site.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222