检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨文斌 YANG Wenbin(China Railway SIYUAN Survey and Design Group Co.,Ltd.Wuhan 430063)
机构地区:[1]中铁第四勘察设计院集团有限公司城地院,武汉4430063
出 处:《铁道勘测与设计》2023年第3期88-92,共5页Railway Survey and Design
摘 要:城市轨道交通越江通道是连接城市临江两岸的重要纽带,通道方案设计的环境复杂程度较高、技术难度较大。本文以武汉市轨道交通11号线四期工程为例,介绍了线路工程概况以及沿线主要控制因素,采用对比分析法从线路条件、换乘方式、对沿线控制物影响等多个方面对线路下穿长江通道方案展开研究,为今后城市轨道交通线路越江方案选择提供参考。The cross-river channel of urban rail transit is an important link connecting the two sides of the city.And the environmental complexity and technical difficulty of the channel design are relatively high.Taking Wuhan Rail Transit Line 11 PhaseⅣProject as an example,this paper introduces the general situation of the line engineering and the main control factors along the line.And the comparative analysis method is used to study the scheme of the route under the Yangtze River channel from the aspects of line conditions,transfer mode and impact on control objects along the line,so as to provide reference for the selection of the cross river schemes for urban rail transit lines in the future.
分 类 号:U23[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90