检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张昕 ZHANG Xin(China Railway SIYUAN Survey and Design Group Co.,Ltd Wuhan 430063)
机构地区:[1]中铁第四勘察设计院集团有限公司机动院,武汉430063
出 处:《铁道勘测与设计》2023年第4期63-67,共5页Railway Survey and Design
摘 要:本研究将城市地下基础设施综合监测信息与BIM可视化系统进行融合,基于对各数据类型的归类分析及监测管理应用场景调研,通过物理模型与BIM模型挂接,把实体运行的数据通过BIM可视化系统进行三维展示,通过可视化界面实时监测基础设施的运行状况,提高了对设施状态的评估能力和对风险因素的预测能力,有效提高地下基础设施的管理能力和安全性。This research integrates the comprehensive monitoring information of urban underground infrastructure with the BIM visualization system.Through the connection of the physical model and the BIM model,the data of the entity operation is displayed in three dimensions through the BIM visualization system,so as to reflect the operation status of the infrastructure in real time and improve the understanding of the facilities.The ability to assess the state,reduce risk factors,and effectively improve the management ability and safety of underground infrastructure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.163.51