检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴雨琪 罗志锋 王帆 杨伟涛[1] 岳建军 彭冲 WU Yuqi;LUO Zhifeng;WANG Fan;YANG Weitao;YUE Jianjun;PENG Chong(School of Civil Engineering and Transportation,South China University of Technology,Guangzhou 510640,China;Architectural Design&Research Institute of SCUT Co.,Ltd.,Guangzhou 510640,China;State Key Laboratory of Subtropical Building Science,South China University of Technology,Guangzhou 510640,China;Hunan No.4 Engineering Company Limited,Changsha 410119,China)
机构地区:[1]华南理工大学土木与交通学院,广州510640 [2]华南理工大学建筑设计研究院有限公司,广州510640 [3]华南理工大学亚热带建筑科学国家重点实验室,广州510640 [4]湖南省第四工程有限公司,长沙410119
出 处:《建筑结构》2023年第11期13-19,53,共8页Building Structure
摘 要:中南大学新校区体育馆主体结构采用钢筋混凝土框架结构,屋盖的最大跨度为92.1m,采用空间钢管桁架结构,具有较好的整体稳定性。屋盖桁架跨度大,温度作用明显,为减小温度变化对结构造成的不利影响,钢结构屋盖与混凝土框架柱之间通过钢管转动柱及固定铰支座组成节点连接,该连接方式使得桁架在因温度变化而产生水平向伸长或缩短时,钢管转动柱通过一定角度的倾斜,以适应屋盖桁架的伸缩变形,从而实现屋盖桁架温度应力的释放,提高了整体结构的承载能力。考虑结构特点及场地条件,采用累积滑移施工。对施工过程进行模拟分析并将桁架应力及挠度的监测值与计算值进行对比,结果表明滑移施工过程安全可靠。The main structure of the gymnasium on the new campus of Central South University adopts a reinforced concrete frame structure.The maximum span of the steel roof is 92.1m,and spatial pipe truss structure is adopted,which has good overall stability.The roof truss has a large span and the temperature effect is obvious.In order to reduce the adverse effects of temperature changes on the structure,the steel structure roof and the concrete frame column are connected by a joint consisting of a steel pipe rotating column and a fixed hinged support.The connection method makes the steel pipe rotating column tilt at a certain angle to adapt to the expansion and deformation of the roof truss when the truss is stretched or shortened horizontally due to temperature changes,so as to release the temperature stress of the roof truss and improve the bearing capacity of the whole structure.Considering the structural characteristics and site conditions,the cumulative sliding construction was adopted.The construction process of the roof slip construction was simulated and analyzed,and the monitoring values of truss stress and deflection were compared with the calculated values.The results show that the construction process is safe and reliable.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.10.218