作 者:李臻 LI Zhen(China Anneng Group First Engineering Bureau Co.,Ltd.,Nanning 530028,Guangxi,China)
机构地区:[1]中国安能集团第一工程局有限公司,广西南宁530028
出 处:《水利水电技术(中英文)》2023年第S01期178-183,共6页Water Resources and Hydropower Engineering
摘 要:水电站高边坡预应力锚索通常设计工程量大,布置面多,进度管理难度及工作量较大,而深层支护施工进度往往是制约电站总体施工进度的关键因素。基于Excel软件,以大渡河流域某水电站溢洪道高边坡为例,针对无粘结预应力锚索支护施工进度管理研究形成了一套成体系的工具,以期为相似工程施工进度管理提供借鉴。The prestressed anchor cable of high slope of hydropower station is usually designed with large quantities of work,many layout areas,and the schedule management is difficult and the workload is large.The construction schedule of deep support is often the key factor restricting the overall construction schedule of the hydropower station.Based on the Excel software,taking the high slope of the spillway of a hydropower station in the Dadu River Basin as an example,this paper forms a set of systematic tools for the construction progress management of unbonded prestressed anchor cable support,in order to provide reference for the construction progress management of similar projects.
关 键 词:EXCEL 高边坡 预应力锚索支护 进度管理 工具
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13