武汉市东西湖区G107国道与四环线互通立交方案研讨  被引量:1

Discussion on Interchange Scheme of G107 National Highway&Fourth-Ring Road in Dongxihu District of Wuhan

在线阅读下载全文

作  者:熊壮 屈兴威 蔡汗 XIONG Zhuang;QU Xing-wei;CAI Han(Central&Southern China Municipal Engineering Design&Research Institute Co.,Ltd.,Wuhan 430000,China)

机构地区:[1]中国市政工程中南设计研究总院有限公司,湖北武汉430000

出  处:《中国市政工程》2023年第3期14-17,111,共5页China Municipal Engineering

摘  要:结合现状建设条件、路网规划及交通量预测,确定立交功能定位,分析立交匝道落地点位置,提出G107与四环线“双喇叭”“单喇叭+T形”2个立交方案。通过对比,确定“单喇叭+T形”立交方案为推荐方案,即由G107国道高架层引出4条匝道,接入四环线长青收费站,与现状单喇叭立交形成组合式立交。Based on the current construction conditions,road network planning&traffic volume prediction,the function positioning of the interchange is determined,the on-ramp landing location of the interchange is analyzed,and two interchange schemes of double horn&single horn+T-shaped are proposed for G107 and the Fourth-Ring Road.By comparison,it is determined that the single horn+T-shaped interchange scheme is the recommended scheme,that is,four ramps are led from the elevated level of G107 National Highway and connected to the Changqing Toll Station of the Fourth-Ring Road,forming a combined interchange with the current single horn interchange.

关 键 词:城市快速路 交通量预测 双喇叭立交 “单喇叭+T形”立交 

分 类 号:U448.17[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象