近距离采空区下切眼全断面全锚支护技术研究  

Full-face Full-anchor Support Technology for Short-distance Goaf Undercut

在线阅读下载全文

作  者:邢夏冰 XING Xiabing(Malan Coal Mine,Xishan Coal Electricity Co.,Ltd.of Shanxi,Gujiao 030205,Shanxi,China)

机构地区:[1]山西西山煤电股份有限公司马兰矿,山西古交030205

出  处:《能源与节能》2023年第6期127-130,共4页Energy and Energy Conservation

摘  要:为了解决传统支护方法存在的工艺复杂、材料消耗极大、职工劳动强度大等问题,马兰矿根据实际情况,拟在12706切眼0~150 m段实施全断面全锚支护。研究表明,全断面全锚支护技术与传统常规施工方法相比,工期缩短了30 d,支护材料投入节省195778元左右,极大地降低了职工的劳动强度。In order to solve the problems of traditional support methods,such as complex process,huge material consumption and high labor intensity of employees,Malan Coal Mine planned to implement full-section full-anchor support in the 0-150 m section of 12706 open-off cut according to the actual situation.Studies have shown that compared with the traditional construction methods,the full-section full-anchor support technology can shorten the construction period by 30 days,and save about 195778 yuan in support materials investment,and the labor intensity of employees has been greatly reduced.

关 键 词:近距离采空区 切眼 全断面全锚支护技术 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象