作 者:程志刚 Cheng Zhigang(Sinopec Shanghai Engineering Co.,Ltd.,Shanghai 200120,China)
出 处:《广东化工》2023年第11期118-119,共2页Guangdong Chemical Industry
摘 要:预试车作为海外化工装置EPC项目施工安装与试车的中间环节,根据业主方的装置试车与开车的总体计划,合理有序地组织预试车和系统完工交付工作,对于高标准完成机械竣工,及早交付试车团队开展试车工作,实现装置一次开车成功,起着重要的作用。由于预试车缺少统一的标准规范,本文比较了国内、国外预试车的概念与区别,对国际上采用的预试车组织与交工模式进行简要介绍,结合实践案例,总结了预试车实施的注意事项,对海外和国内的项目执行有一定参考意义。Pre-commissioning phase is critical part between construction and commissioning for oversea EPC(Engineering,Procurement,Construction)projects.Based on owner’s commissioning and start-up schedule,to develop well-organized pre-commissioning procedures and system handover procedures will support achieve project mechanical completion,as well as commence commissioning activities earlier and ensure plant initial start-up successfully.Currently due to lack of common standard and specifications in oversea projects,this article compares the definition and work scope of pre-commissioing in domestic and oversea projects and introduces the method of pre-commissioning organization and system handover taken in oversea projects and also highlight key factors during execution,which is hoped to provide certain reference for execution of oversea projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7