检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢湘平 王小军 谭懿飞 张宇航 黄宏鑫 XIE Xiangping;WANG Xiaojun;TAN Yifei;ZHANG Yuhang;HUANG Hongxin(Anyang Institute of Technology,Civil and Architecture engineering collage,Anyang 455000,Henan,China)
机构地区:[1]安阳工学院土木与建筑工程学院,河南安阳455000
出 处:《山地学报》2023年第2期228-242,共15页Mountain Research
基 金:国家自然科学青年基金(41907258);安阳工学院博士科研启动基金(BSJ2019011)~~。
摘 要:重力式拦砂坝因坝后淤积、库容不足,泥石流拦蓄作用失效,后续翻坝泥石流坠砸下游坝基,是拦砂坝损毁的主要成因之一。采用工程措施清淤调库,提高拦砂坝淤积满库后的可持续利用,是泥石流防治工程设计中面临的实际问题。本文通过理论分析、模型实验等研究方式分析了重力式拦砂坝的满库状态,设计了鱼脊型格栅装置或组合格栅装置,构建新型拦砂坝体系,研究了泥石流的调控效果。结果表明:(1)重力式拦砂坝库容内的泥沙堆积体形成的缓坡段与组合式格栅装置共同作用可实现对泥石流的调控;在小流量的水石流情况下缓坡段的自然分选作用明显,而在流量较大的稀性泥石流条件下组合格栅的拦粗排细作用效果显著;(2)组合格栅的拦粗排细率与其作用的泥石流固体物质颗粒级配参数fc′呈先增大后减小的抛物线关系;在水石流和泥石流条件下,fc′分别达到41.5%和36.9%时,拦粗排细率达到最大,即组合格栅的拦粗排细效果最优;(3)新型拦砂坝体系对泥石流泥沙总分离率与粗颗粒分离率均与形成泥石流的固体物质颗粒级配参数fc呈正比关系;泥石流初始容重越大,调控后容重减小越明显。本研究为继续发挥满库后的重力式拦砂坝的泥石流调控作用提供了方案,具有重要的工程实践意义。Gravity-type check dams built in the valleys with high occurrences of debris flow are inclined to fail in regulating of debris flows after heavy silting and decreasing storage capacity occurring in the dams;subsequent overturning of debris flows fall on the downstream dam foundation,quite often resulting in dam damages,even broken-down.The use of engineering measures to remove sediment and improve the sustainable use of check dams after full reservoir is a practical problem in the design of debris flow prevention and control engineering.In this study,it investigated the performance of gravity-type check dams by theoretical analysis,model experiment and other research methods,and then a fish-ridge type metal grid structure(a herringbone water-sediment separation structure)or a combination metal grid structure was introduced to build up a new type of barrier system for regulation of debris flow,and the control effect of the system was examined.We have the following results:(1)Gentle gravel slope behind dam formed by sediment accumulation because of debris flow transportation in the reservoir of check dam and the combined metal grid structure can jointly realize the regulation of debris flow.(2)Under entrainment of water-stone flow,evidently the gentle gravel slope had an active role in grain sorting and sieving,whereas under relatively larger erosion of watery debris flow,it was remarkable in the effect of trapping coarse debris and discharging fine particles.(3)The particle grade parameter(f c′)of solid component in an occurrence of debris flow after being sorted and sieved by our advocated structure of combination metal grid described a parabolic curve of first increasing and then decreasing,and it stood for its drainage effect.In case subjected to water-stone flow and watery debris flow,f c′could reach 41.5%and 36.9%respectively,with a maximum drainage effect,the best function of trapping coarse debris and discharging fine particles.The separation efficiency for a bulk of debris flow sediment or its coarse c
关 键 词:泥石流 重力式拦砂坝 可持续利用 组合式格栅装置
分 类 号:P642.23[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33