检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘国安 LIU Guoan(Wugang Municipal Water Conservancy Bureau,Wugang 462500,China)
机构地区:[1]舞钢市水利局,河南舞钢462500
出 处:《河南水利与南水北调》2023年第4期34-35,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:供水工程一般包括地表水源、地下水源工程2大类型。地表水源工程包括蓄水、引水、提水及调水工程。地下水源工程指汲取地下水的水井工程,包括农村机电井、城镇自来水井及企业自备井。文章通过该水厂建设规模、供水现状,分析了区域需水量、区域供水量、区域耗水量以及水资源开发利用程度,得出水资源总量偏小、总体开发利用程度高,为减少严重缺水的客观形势,应加大引黄和陆浑水库的引水量,以解燃眉之急。Water supply engineering generally includes two types:surface water source and underground water source engineering.Surface water source works include water storage,water diversion,water lifting and water diversion works.Groundwater source project refers to the well project of absorbing groundwater,which includes rural mechanical and electrical wells,urban water wells and enterprise-owned wells.The article analyzes the regional water demand,supply,consumption,and utilization level of water resources through the construction scale and current water supply situation of the water plant.It concludes that the total amount of water resources is relatively small,but the overall development and utilization level is high.To alleviate the severe water shortage,it is necessary to increase the water diversion from the Yellow River and the Luhan Reservoir to relieve the urgent situation.
分 类 号:TV213.9[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.35