检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谭庆慧 普泽 李琦 秦宇翔 杨永灿 TAN Qing-hui;PU Ze;LI Qi;QIN Yu-xiang;YANG Yong-can(Yunnan HuadianJinsha River Midstream Hydropower Development Co.,Ltd.,Ahai Power Generation Branch,Lijiang 674100,China)
机构地区:[1]云南华电金沙江中游水电开发有限公司阿海发电分公司,云南丽江674100
出 处:《云南水力发电》2023年第6期39-41,共3页Yunnan Water Power
摘 要:水电站顶盖排水系统为水轮发电机组的重要辅助系统,其作用是及时排出顶盖内主轴密封、活动导叶轴套等部位的漏水。顶盖排水系统缺陷引发的水淹水导轴承事故在国内外时有发生,其可靠性时常困扰着水电站的维护人员。以阿海水电站顶盖排水系统为例,深入分析顶盖排水泵运行时间长的原因并进行优化改造,大大缩短了顶盖排水泵运行时间、提高了顶盖排水泵使用寿命。The top cover drainage system of hydropower station is an important auxiliary system of the hydraulic generator unit.Its function is to drain water leaking from the main shaft seal and movable guide vane bushing in the top cover in time.Flooding guide bearing accidents caused by defects of head drainage system occur frequently at home and abroad,and its reliability often troubles maintenance personnel of hydropower stations.Taking the top cover drainage system of Ahai Hydropower Station as an example,the reasons for the long operation time of top cover drainage pump are deeply analyzed and optimized,which greatly shortens the operation time of top cover drainage pump and improves the service life of top cover drainage pump.
关 键 词:水电站 顶盖排水系统 主轴密封 活动导叶轴套 水导轴承
分 类 号:TV734.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.125.13