检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石勇[1] 白德贵[1] SHI Yong;BAI Degui(Chongqing Survey Institute,Chongqing 401121,China)
机构地区:[1]重庆市勘测院,重庆401121
出 处:《城市勘测》2023年第3期159-161,共3页Urban Geotechnical Investigation & Surveying
摘 要:轨道梁施工线型与设计线型最大程度匹配,将提高线路的平顺性,增加乘坐列车的舒适性。本文采用了一种轨道梁活动对中器及测量标志,改进了轨道梁线型高精度测量方法,提高了轨道梁线型测量精度,分析了施工线型成果与设计线型的关系,将对类似轨道梁线型高精度测量工程提供经验参考。The maximum matching between the construction line type and the design line type of the track beam will improve the smoothness of the line and increase the comfort of the train.This paper use a kind of track beam movable centering device and measurement mark,improves the high-precision linear measurement method of track beam,improves the linear measurement accuracy of track beam,analyzes the relationship between construction linear results and design linear,and provides experience reference for similar high-precision linear measurement engineering of track beam.
分 类 号:P258[天文地球—测绘科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.158