检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:甘泽 胡俊杰 杨荟颖 吴显航 GAN Ze;HU Junjie;YANG Huiying;WU Xianhang(Chongqing Survey Institute,Chongqing 400002,China;Chongqing Surveying and Design Institute Co.,Ltd.of Water Resources,Electric Power and Architecture,Chongqing 400002,China)
机构地区:[1]重庆市勘测院,重庆400002 [2]重庆市水利电力建筑勘测设计研究院有限公司,重庆400002
出 处:《城市勘测》2023年第3期196-199,共4页Urban Geotechnical Investigation & Surveying
摘 要:西南地区某水库坝址具备修建重力坝的地形地质条件,但坝区工程地质复杂,处理范围内主要的地质缺陷有泥化夹层、软弱岩体、破碎带等,这些地质缺陷对重力坝的体形选择和抗滑稳定等,均会产生较大影响,需要通过相应的基础处理及结构措施,使地基能适应重力坝所要求的边界约束条件。A reservoir dam site in the southwest China has the topographical and geological conditions for the construction of gravity dam,but the engineering geology of the dam area is complicated.The main geological defects in the treatment range are argillated interlayer,weak rock mass,fracture zone and so on.These geological defects have a great influence on the shape selection and anti-sliding stability of gravitydam.Through the corresponding foundation treatment and structural measures,the foundation can adapt to the boundary constraints required by gravity dam.
分 类 号:TV642.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.23.30