9103回采巷道接长锚杆支护方案的优选与效果对比  

Optimization and Effect Comparison of 9103 Mining Roadway Extension Bolt Support Schemes

在线阅读下载全文

作  者:杨科飞 Yang Kefei(Shanxi Maomaoshan Coal Industry Co.,Ltd.,Datong Shanxi 037100)

机构地区:[1]山西帽帽山煤业有限公司,山西大同037100

出  处:《机械管理开发》2023年第5期19-20,23,共3页Mechanical Management and Development

摘  要:为进一步提升回采巷道的支护效果,保证煤矿生产的安全性,以9号煤层所属回采巷道为研究对象,在对其地质条件分析的基础上,对其顶板的松动圈进行测试,并基于仿真计算FLAC3D软件对初步设计支护方案的应力和应变进行对比,从而得出最佳支护方案。通过工业性试验验证了接长锚杆支护的效果和优势,为今后在煤矿支护中应用奠定基础。In order to further improve the support effect of mining roadway and ensure the safety of coal mine production.Taking the mining roadway of Coal Seam 9 as an example,based on the analysis of its geological conditions,the loose zone of its roof was tested;Secondly,based on FLAC3D software,the stress and strain of the preliminary design support scheme are compared to obtain the best support scheme;Finally,the effectiveness and advantages of extended bolt support were verified through industrial tests,laying a foundation for future application in coal mine support.

关 键 词:接长锚杆 顶板位移 锚固力 松动圈 锚索 

分 类 号:TD353.6[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象