检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Amin Manouchehrian Pinnaduwa H.S.W.Kulatilake
出 处:《Underground Space》2022年第6期1086-1097,共12页地下空间(英文)
基 金:the Jiangxi University of Science and Technology,China(Grant No.205200100469);the Distinguished Foreign Expert Talent Program Funding(China)are gratefully acknowledged.
摘 要:A destressing method for reducing the strainburst risk in burst-prone grounds is suggested.In this method,the rock is destressed by cutting notches at the excavation boundary.First,the concept of the proposed method is described both analytically and numerically.Then,the method is applied to a tunneling problem.Several numerical models are built to study the destressing process and the failure mechanism around a circular tunnel.Results show that when the notch is added to the model,the rock at the tunnel wall is destressed,and the stress concentration zones shift to a farther distance away from the wall.Also,the analysis of the failure zone around the tunnel and the velocity of the failed elements show that the failure in the notched tunnel is less violent compared to that in the tunnel without the notch.Finally,a parametric study is conducted to investigate the influences of the notch dimensions on the stress distribution,deformation,and failures around the tunnel.
关 键 词:Strainburst DESTRESSING Deep excavation Notched tunnel Rock violent failure
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.130