检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:T.Hara A.Yashima K.Sawada K.Kariya H.Tsuji N.Soga
机构地区:[1]University of Toyama,Japan [2]Gifu University,Japan [3]Eight Kogyo Co.Ltd.,Japan
出 处:《Underground Space》2019年第3期235-250,共16页地下空间(英文)
摘 要:Japan is a mountainous country comprising several islands,in which mountains occupy 70%of the entire land.Therefore,numerous transmission line towers have been constructed in the shallow space of steep mountainous areas.In such construction,monorails and/or cableways are generally used to transport materials and equipment to the construction site instead of using a construction road,as the former method is more economically viable.However,with this method,drill rigs or vertical shaft sinking machines cannot be transported to the site.Four small-diameter vertical shafts of 2.5 or 3.0 m as the foundation for high-voltage transmission line towers in mountainous areas are traditionally constructed manually in Japan.Over the past two decades,however,dangerous and poor environmental conditions for workers regarding the manual construction of these small-diameter vertical shafts have become a major problem.Meanwhile,owing to the poor environmental conditions of small-diameter vertical shafts to be constructed in the shallow space of steep mountainous areas,a decrease has occurred in the number of young workers entering these projects.Namely,the construction of transmission line towers with using the manually traditional small-diameter vertical shafts is becoming difficult in Japan from abovementioned problems.Hence development of a new technology to solve the problems is necessary for Japan’s economic growth.With this knowledge,the authors have developed a new small-diameter vertical shaft construction system,in which workers do not have to enter the vertical shaft during construction,as machines are used instead.The applicability of the proposed system was confirmed by means of the construction of three actual vertical shafts at two construction sites,as well as in factory and field tests.The applicability and details of the final proposed system are summarized in this paper.
关 键 词:Small-diameter vertical shaft Shallow space Steep mountainous area
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229