检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵毅轩 刘爱芳[1] 黄龙 ZHAO Yi-xuan;LIU Ai-fang;HUANG Long(The 14th Research Institute of CETC,Nanjing 210039)
机构地区:[1]中国电子科技集团公司第十四研究所,南京210039
出 处:《雷达与对抗》2023年第2期20-24,共5页Radar & ECM
摘 要:针对新型系统工程实际需求,提出一种快速验证InSAR相位同步MGC正确性的方法。利用等效思想与矢量投影方法,巧妙快速计算同步信号发射接收的离轴角,减少了运算量,提高了算法的时效性;通过模拟卫星遥测数据、卫星下行的同步信号数据开展地面仿真试验。仿真与试验结果证明了方法的有效性,为双基编队卫星InSAR相位同步性能评估提供了有效保障。A rapid method is proposed for verifying the correctness of InSAR system phase synchronization MGC in response to the practical engineering requirements of a new system.The concept of equivalence and vector projection method is utilized to quickly calculate the off-axis angles of synchronous signal transmission and reception,reducing the computational complexity and improving the algorithm timeliness.Ground simulation tests are conducted by simulating satellite telemetry data and synchronous signals in the satellite downlink.The simulation and test results show that the method proves to be effective,providing an effective guarantee for the performance evaluation of InSAR phase synchronization for dual base formation satellites.
分 类 号:TN959.74[电子电信—信号与信息处理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15