高瓦斯矿井综采工作面综合瓦斯治理技术应用  被引量:1

Application of comprehensive gas control technology in fully-mechanized mining faces of high gas mines

在线阅读下载全文

作  者:李玉 LI Yu(Huayang New Material Technology Group Co.,Ltd.Shanxi Xinjing Ming Coal Industry Co.,Ltd.,Yangquan 045000,China)

机构地区:[1]华阳新材料科技集团有限公司山西新景矿煤业有限责任公司,山西阳泉045000

出  处:《煤炭科技》2023年第3期181-184,共4页Coal Science & Technology Magazine

摘  要:某矿为高瓦斯矿井,该矿3203综采工作面在回采各阶段分别应用了不同的瓦斯治理技术。通过对工作面瓦斯涌出量、以及工作面与回风瓦斯浓度、瓦斯抽采浓度、抽采纯量、抽采负压等参数的研究分析发现,开采保护层在高瓦斯矿井治理瓦斯问题上具有明显的瓦斯治理效果,利用高抽巷进行瓦斯抽采的效果要明显优于利用高位钻场进行瓦斯抽采的效果,在2段高抽巷接替使用期间预留出20~40 m接替距离可以确保瓦斯抽采取得较好效果。A certain mine is a high gas mine,and the 3203 fully-mechanized mining face of the mine has applied different gas control technologies in each stage of mining.Through the research and analysis of the gas emission from the working face,as well as the concentration of gas between the working face and the return air,gas extraction concentration,extraction purity,and extraction negative pressure,it was found that the mining protective layer has a significant gas control effect on the gas problem in high gas mines.The effect of using high gas extraction tunnels for gas extraction is significantly better than that of using high level drilling sites for gas extraction,setting aside a replacement distance of 20-40 meters during the use of the second section of high drainage roadway can ensure that gas extraction achieves good results.

关 键 词:高瓦斯矿井 开采保护层 高抽巷 瓦斯抽采 

分 类 号:TD712[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象