检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段刚刚 Duan Ganggang(Jinneng Holding Coal Industry Group Changping Coal Industry Co.,Ltd.,Gaoping Shanxi 048400)
机构地区:[1]晋能控股煤业集团长平煤业有限责任公司,山西高平048400
出 处:《山西冶金》2023年第5期218-220,共3页Shanxi Metallurgy
摘 要:为提高煤矿巷道贯通精度,确保巷道顺利贯通,以某巷道贯通工程概况为例,预计贯通误差,分析贯通测量结果,通过应用仪器测量、优化观测手段、改进数据处理方法等操作,使巷道贯通测量的精准度得到提高,保障了该巷道精准贯通。研究表明,该14 km贯通工程精度水平在重要方向的贯通误差控制在0.128 m,高程贯通误差控制在0.215 m,实现了精准顺利贯通,可为类似工况下的巷道贯通提供参考。In order to improve the accuracy of coal mine tunnel penetration and ensure the smooth penetration of the tunnel,taking the overview of a certain tunnel penetration project as an example,the expected penetration error,analysis of penetration measurement results,application of instrument measurement,optimization of observation methods,improvement of data processing methods,and other operations,the accuracy of tunnel penetration measurement has been improved,ensuring the accurate penetration of the tunnel.Research has shown that the accuracy level of the 14 km connection project is controlled at 0.128 m in important directions,and the elevation connection error is controlled at 0215 meters,achieving precise and smooth penetration,which can provide reference for tunnel penetration under similar working conditions.
分 类 号:TD175[矿业工程—矿山地质测量]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.250.210