检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑艳梅[1] 饶士立 刘平[1] ZHENG Yanmei;RAO Shili;LIU Ping(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443000,China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2023年第6期65-67,70,共4页Hydropower and New Energy
摘 要:针对水布垭水力发电厂4号机组远方开机失败(导叶没有打开),在做开机过程中通道切换检查时,发生机组机械过速紧急停机,为解决此问题,对调速器防过速控制程序进行了以下优化:对调速器自动通道A套、B套程序加入通道故障及切换判断;对调速器手动通道C套程序加入过速或越限后的关机判断;调速器C套关闭开停机阀后,C套独立输出调速器事故信号至监控系统自启动快速停机流程,该信号为5 s脉冲信号。优化后彻底消除了由于液压系统故障引起导叶失控导致非负载态机组严重过速的安全隐患。The 4#unit in Shuibuya Hydropower Station experienced a remote startup failure as the guide vanes could not open.During the channel switching inspection in the startup process,a mechanical over-speed emergency shutdown occurred.To solve this problem,the over-speed prevention control program of the governor is optimized.Channel fault and switching judgement is added to the automatic channel A and B programs.Over-speed or over-limit shutdown judgements are added to the manual channel C program.When the startup and shutdown valve of the governor is closed by the channel C program,it will independently output a 5-second pulse governor accident signal to the monitoring system to automatically start the rapid shutdown process.The optimization completely eliminates the serious over-speed hazard of the unit in a non-load state caused by hydraulic system fault induced uncontrollable guide vanes.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222