检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:K.Dharani Sree P.Karpagavalli
出 处:《Intelligent Automation & Soft Computing》2023年第1期1181-1195,共15页智能自动化与软计算(英文)
摘 要:The distributed generators in the radial distribution network are to improve the Grid performance and its efficiency.These Distributed Generators control the PV bus;it is converted as a remote controlled PVQ bus.This PVQ bus reduces the power loss and reactive power.Initially,the distributed generators were placed in the system using mathematical modelling or the optimization.This approach improves the efficiency but it has no effect in loss minimization.To minimize the loss the reconfigured network with Genetic algorithm based Distributed generator placement proposed as existing work.This approach minimizes the loss effectively;but the genetic algorithm takes more time for DG placement.Hence,in this,the network reconfiguration is performed using a modified Satin bower bird algorithm after DG placement and DG sizing.Initially,the sensitive analysis applied the loadflow analysis to identify the optimal placement for the distributed generator.Then,the modified Satin Bowerbird(SBO)used for the network reconfiguration.This approach minimizes the loss of effectively by combining the network reconfiguration process.The proposed modified SBO-based network reconfiguration implemented on standard bus systems 33 and 69 using MATLAB R2021b version under Windows 10 environment.The proposed approach compared with the existing work in terms of real power loss and loss reduction.
关 键 词:IEEE bus system DG placement optimization network reconfiguration real power loss
分 类 号:TP393[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90