特高土石坝首次蓄水期坝基渗控监测分析评价  被引量:1

Analysis and evaluation of seepage control monitoring of dam foundation during first impoundment period of a ultra-high earth rock dam

在线阅读下载全文

作  者:曹文彬 罗鹏飞 邓韶辉 刘健 CAO Wenbin;LUO Pengfei;DENG Shaohui;LIU Jian(PowerChina Zhongnan Engineering Corporation Limited,Changsha 410000,China;Yalong River Hydropower Development Co.,Ltd.,Chengdu 610051,China)

机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014 [2]雅砻江流域水电开发有限公司,四川成都610051

出  处:《人民长江》2023年第6期231-235,共5页Yangtze River

摘  要:水库蓄水期的坝基渗流控制效果评价是大坝安全评价的重要组成部分,总结蓄水期坝基渗流变化规律对特高土石坝工程的安全运行意义重大。以中国已建成的300 m级特高土石坝——两河口水电站砾石土心墙堆石坝为例,结合工程布置特点,利用监测成果分析、地质条件分析等手段,分析和讨论蓄水过程中的渗控监测情况,指出了相关问题和可能存在的注意事项,对渗控措施的工程效果进行了评价。首次蓄水期坝基渗流分析表明:蓄水期坝基渗压与库水位的变化存在一定相关性且相关性效应需在一定水头作用下才会显现,坝基渗压变化较库水位变化一般具有滞后性,坝基深部渗压并不一定关联反映水头或水位。相关经验可为后续类似高土石坝建设提供借鉴。The evaluation of seepage control effect of dam foundation in the impoundment period is an important part of dam safety evaluation.It has significant meaning to summarize the seepage variation law of dam foundation during impoundment period for ensuring safe operation of ultra-high earth rock dams.Taking a 300m-level ultra-high earth-rock dam,Lianghekou Hydropower Station in China as an example,we analyzed and discussed the seepage control monitoring in the process of impoundment by analyzing the monitoring data and considering geological conditions as well as engineering layout.We ascertained the relevant problems and possible precautions and evaluated the engineering effect of seepage control measures.The result show that there is a certain correlation between the seepage pressure of dam foundation and the change of reservoir water level during the storage period,and the correlation effect only appears under the action of a certain water head.The change of seepage pressure of the dam foundation generally lags behind the change of reservoir water level.The deep seepage pressure of the dam foundation does not necessarily reflect the head or water level.The relevant experiences in this paper can provide references and ideas for subsequent similar projects.

关 键 词:特高土石坝 首次蓄水 坝基渗控 渗压监测 两河口水电站 

分 类 号:TV641.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象