检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张贵彬 ZHANG Guibin
机构地区:[1]国家能源集团国源电力宝清电厂,黑龙江双鸭山155600
出 处:《电力系统装备》2023年第5期9-11,14,共4页Electric Power System Equipment
摘 要:研究湿法脱硫工艺石灰石脱硫剂制备及吸收反应的延时特性,对石灰石耗量进行精准计量控制,对实现我国“双碳”目标具有重要现实意义。应用于某亚临界300 MW机组的分析结果表明,石灰石的输入量与吸收反应消耗量之间具有延时性,临界累计时长为21 h,累计时长小于临界累计时长,两者瞬时值和累计值不具有对应关系;累计时长达到21 h时,两者累计值趋于一致,此时,文中引入的无量纲比值M为1%,其均方差为17.1。It is of great practical significance to study the delay characteristics of limestone desulfurizer preparation and absorption reaction in the wet desulfurization process,and to accurately measure and control the limestone consumption,so as to achieve the goal of''double carbon''in China.The analysis results applied to a subcritical 300 MW unit show that there is a delay between the limestone input and the absorption reaction consumption.There is a critical cumulative duration of 21 hours,which is less than the critical cumulative duration,and there is no corresponding relationship between the instantaneous value and the cumulative value;When the cumulative duration reaches 21 hours,the cumulative values of the two approaches the same.At this time,the dimensionless ratio M introduced in this paper is 1%,and its mean square deviation is 17.1.
分 类 号:TM61[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.200.110