某风电场35 kV风机集电线路上塔电缆头多次击穿原因分析  被引量:1

Analysis of the Causes of Multiple Breakdowns of the Tower Cable Head on the 35 kV Wind Turbine Collector Wire of a Wind Farm

在线阅读下载全文

作  者:张世雄 Zhang Shixiong(China Three Gorges New Energy(Group)Company Limited,Zhangjiakou Hebei 075000)

机构地区:[1]三峡新能源康保发电有限公司,河北张家口075000

出  处:《现代工业经济和信息化》2023年第5期330-331,共2页Modern Industrial Economy and Informationization

摘  要:剖析了某风电场同一集电线路连续发生三次上塔电缆头击穿事故,介绍了集电线路基本情况,对电缆头击穿故障进行分析,阐述了处理过程,并且提出了预防措施,为此类故障处理提供一定思路。An analysis was conducted on three consecutive incidents of cable head breakdown on the same collection line in a wind farm.The basic situation of the collection line was introduced,and the cable head breakdown fault was analyzed and discussed.The handling process was shared,and preventive measures were proposed to provide some ideas for handling such faults.

关 键 词:电力电缆 电缆头 击穿 

分 类 号:TM614[电气工程—电力系统及自动化] TM77

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象