补连塔煤矿22310综采面回采经验分析  被引量:1

Mining experience analysis of 22310 fully mechanized face in Bulianta Coal Mine

在线阅读下载全文

作  者:卞涛 李金刚 呼天峰 BIAN Tao;LI Jin gang;HU Tianfeng(Bulianta Coal Mine,CHN Energy Shendong Coal Group Co.,Ltd.,Erdos 017209,China)

机构地区:[1]国能神东煤炭集团有限责任公司补连塔煤矿,内蒙古鄂尔多斯017209

出  处:《中国矿业》2023年第S01期350-354,共5页China Mining Magazine

摘  要:针对大采高综采工作面回采过程中顶板压力大、顶板控制难、出现底鼓难等一系列现场管理难题。以补连塔煤矿大采高综采工作面为例,介绍了7 m大采高综采工作面回采过程中支架工作阻力确定方法、顶板管控办法、末采贯通顶板控制。为类似地质条件的大采高综采工作面顶板管理提供一定的借鉴。Aimed at a series of field management problems such as high roof pressure,difficult roof control and floor heave in the process of fully mechanized face with large mining height.Taking Bulianta Coal Mine as an example,this paper introduces the determination method of working resistance of support,roof control method and roof control in the process of fully mechanized face with 7 m mining height.It provides a certain reference for the roof management of fully mechanized face with large mining height under similar geological conditions.

关 键 词:顶板压力 工作面阻力 顶板管控 末采贯通 底鼓 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象