广佛肇高速公路北江大桥基础施工关键技术  被引量:1

Key Techniques for Foundation Construction of Beijiang Bridge in Guangfozhao Expressway

在线阅读下载全文

作  者:尚庆果 何明辉[2] SHANG Qingguo;HE Minghui

机构地区:[1]中铁大桥局第九工程有限公司,广东中山528400 [2]中铁大桥局集团有限公司,湖北武汉430050

出  处:《城市道桥与防洪》2023年第6期188-190,246,M0018,M0019,共6页Urban Roads Bridges & Flood Control

摘  要:北江大桥33#墩采用钻孔灌注桩和分离式承台,承台位于风化泥岩范围内,且墩位处水位较深,流速较大,基础施工技术难度大。经研究,确定采用了“钻孔平台+钢板桩围堰”的施工方法。钢板桩围堰施工采用了旋挖钻机引孔及水下高压注浆的施工关键技术,并且承台范围内基岩开挖采用预开挖及围堰干挖法取土的施工方式,解决了无覆盖层且嵌岩的低桩承台施工难题。The 33#pier of Beijiang Bridge is adopted of bored pile and separated base slab.The base slab is located in the range of weathered mudstone,the water level at the pier is deep and the water velocity is fast.The foundation construction technology is difficult.After research,the construction method of"drilling platform+steel sheet pile cofferdam"is determined.The key technologies of rotary drilling rig pilot hole and underwater high-pressure grouting are adopted for the construction of steel sheet pile cofferdam,and the construction method of pre-excavation and cofferdam dry excavation is adopted for the excavation of bedrock within the range of base slab,which solves the construction problem of low-pile base slab without coating and rock-socketed.

关 键 词:北江大桥 钻孔平台 围堰 铣槽 高压注浆 干挖 施工技术 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象