作 者:陈麟捷 陈霄峰 CHEN Linjie;CHEN Xiaofeng(China Energy Engineering Group East China Electric Power Test Research Institute Co.,Ltd.,Hangzhou 311200,China)
机构地区:[1]中国能源建设集团华东电力试验研究院有限公司,浙江杭州311200
出 处:《电力勘测设计》2023年第6期56-60,共5页Electric Power Survey & Design
摘 要:针对高比例掺烧污泥的循环流化床锅炉污泥热值不稳定、床温飙升、炉渣含碳量高、烟道积灰严重、低温过热器超温等问题,文章分析该锅炉与普通流化床锅炉的不同燃烧特点,采用提高首次投泥床温、加大床层热惯性、增加泥煤掺烧比例和床温速率测点、优化锅炉跳闸逻辑、增加一次风量和锅炉吹灰频次、令低温过热器管壁刻意结垢等措施进行调试。现场调试结果证明以上方法有效。Aiming at the problems of unstable sludge calorific value of sludge blended with high proportion of sludge,significant increase of bed temperature,high carbon content of slag,serious ash accumulation in the flue and over-temperature of low temperature superheater in circulating fluidized bed boiler,this paper analyzes the different combustion characteristics of this boiler and other common fluidized bed boilers,and adopts the measures of increasing the bed temperature of first sludge feeding,increasing the thermal inertia of bed,increasing the proportion of sludge blending and bed temperature rate measuring point,optimizing the logic of boiler tripping,increasing the The commissioning was carried out by increasing the primary air volume and boiler soot blowing frequency,and allowing the low-temperature superheater tube wall to be deliberately scaled.The field commissioning results prove that the above measures are effective.
分 类 号:TM621.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49