检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段晓宇 于丁安 康钰 DUAN Xiaoyu;YU Ding'an;KANG Yu(Huadian Xinzhou Guangyu Coal Power Co.,Ltd.,Xinzhou,Shanxi 034000,China)
机构地区:[1]华电忻州广宇煤电有限公司,山西忻州034000
出 处:《山西电力》2023年第3期35-38,共4页Shanxi Electric Power
摘 要:随着现有火电机组的老化和社会用电负荷的持续增长,火力发电公司亟须制定合适的火电容量扩展规划来适应未来负荷用电需求。针对此问题,以火电机组投资成本和运行成本为上层优化目标,以现有和未来投建的火电机组运行成本为下层优化目标,建立了基于双层优化的火电机组容量扩展规划模型,并提出了基于原对偶理论的求解方法。以某发电厂为例,在Cplex中编程仿真,验证了所提双层模型的有效性和可行性。With the aging of existing thermal power units and the continuous growth of social electricity load,it is urgent for thermal power generation companies to develop appropriate thermal power capacity expansion plan to meet the future load demand.In order to deal with this problem,a capacity expansion planning model for thermal power units based on double-layer optimization is established,with the investment cost and operation cost of thermal power units as the upper optimization objectives and the operation cost of the existing and future construction of thermal power units as the lower optimization objectives.Then,a solution method based on the primal duality theory is proposed.Finally,with a power plant as an example,programming simulation in Cplex verifies the validity and feasibility of the proposed double-layer model.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.70.25