检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Maryon Eliza Matius Mohd Azlan Ismail Adriana Erica Amaludin Yan Yan Farm Mohd Adzrie Radzali Ahmad Fazlizan Wan Khairul Muzammil
机构地区:[1]Faculty of Engineering,Universiti Malaysia Sabah,Jalan UMS,Kota Kinabalu,88400,Malaysia [2]Centre of Research in Energy and Advanced Materials,Faculty of Engineering,Universiti Malaysia Sabah,Jalan UMS,Kota Kinabalu,88400,Malaysia [3]Solar Energy Research Institute,Universiti Kebangsaan Malaysia,Bangi,43600,Malaysia
出 处:《Energy Engineering》2022年第4期1361-1377,共17页能源工程(英文)
基 金:supported by research grants from the Malaysian Ministry ofHigher Education (MOHE), FRGS/1/2019/TK07/UMS/03/1 and Universiti Malaysia Sabah (UMS),SDK0121-2019.
摘 要:This paper presents a detailed preliminary assessment of load consumption and solar power potential at the Eco-Tourism Centre of Liogu Ku Silou-Silou(EPLISSI),Kota Belud,Sabah.This initial investigation assessed the feasibility of an off-grid solar PV system at EPLISSI with a suitable solar panel system for project installation and commissioning purposes.Due to the absence of an electrical grid and power supply,no pre-existing electrical appliances could be found in EPLISSI.Hence,an excel-based software,the ESCoBox,was used to produce the load profiles.The input data for this software came from a list of required electrical appliances(LED lights,fans,and phone chargers)and the historical frequency of visitors to EPLISSI.Meanwhile,to assess the solar power potential at EPLISSI,an online simulator known as Global Solar Atlas version 2.3 or GSA 2.3 was used.As an input for the GSA 2.3,the initial solar panel system capacity was set for 0.5 kWp,and then an increment of 0.1 kWp was entered until specific criteria were met.The selection of the suitable size is made when the system can satisfy the daily total average load demand and a specific load fulfillment demand.As a result,it was found that the site requires a total average demand and a total peak demand of 4.60 and 11.87 kWh/day,respectively.From the GSA 2.3 generated report,an off-grid solar PV system with the capacity of 2.50 kWp solar PV can satisfy the daily total average load demand of this area,where the average PV energy output is within the range of between 7.74–9.80 kWh/day or an average of 8.72 kWh/day.In conclusion,this preliminary assessment indicates that installing an off-grid solar PV system in this area is possible.
关 键 词:Solar energy rural electrification stand-alone solar PV system load profile ESCoBox MALAYSIA
分 类 号:TK51[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.156.144