检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李培丰 刘宁博 LI Peifeng;LIU Ningbo(Beijing Co.,Ltd of China Water Resources&Hydropower Construction Engineering Consulting,Beijing 100024,China)
机构地区:[1]中国水利水电建设工程咨询北京有限公司,北京100024
出 处:《中国水能及电气化》2023年第6期6-9,47,共5页China Water Power & Electrification
摘 要:圆形混凝土隧洞施工时,仰拱表面气泡集中,属混凝土施工质量重大难题。文章针对双江口水电站两条尾水隧洞施工案例,通过现场大量试验和室内试验,对影响仰拱混凝土表面气泡的产生的质量问题、多种影响因素等进行了分析,根据施工效果,针对性的同时调整了两个及以上主要影响因素,达到了良好的施工质量效果。During the construction of circular concrete tunnels,the concentration of bubbles on the inverted arch surface poses a significant challenge to the quality of concrete construction.This paper focuses on the construction of two tailrace tunnels in Shuangjiangkou Hydropower Station,and analyzes the quality issues and various influencing factors that affect the production of bubbles on the inverted arch concrete surface through a large number of on-site and laboratory experiments.Based on the construction results,multiple main influencing factors are simultaneously adjusted in a targeted manner,achieving a good construction quality effect.
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.135.221