检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱颖儒 张利平 石昊 Zhu Yingru;Zhang Liping;Shi Hao(Northwest Engineering Co.,Ltd.,Xi'an 710065,Shannxi)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,陕西西安710065
出 处:《陕西水利》2023年第7期125-128,共4页Shaanxi Water Resources
摘 要:以某水电站大型多岔调压井为研究对象,用三维有限元法模拟分析调压井施工力学过程,得到施工期调压井围岩的应力场、位移场及塑性区分布等特性,同时还用块体理论对块体稳定进行分析,在上述计算分析成果的基础上,提出一期开挖支护措施型式。通过对施工期监测数据分析可知,支护方式满足设计要求;给出一种针对大型多岔调压井且具有倒悬反拱结构的新的开挖方式,可为同类工程提供很好的借鉴。Taking a large multi-bifurcated regulator well of a hydropower station as the research object,the construction mechanics process of the regulator well is simulated and analyzed by three-dimensional finite element method,and the characteristics of stress field,displacement field and plastic zone distribution of the surrounding rock of the regulator well during the construction period are obtained.At the same time,the block stability is analyzed by block theory.On the basis of the above calculation and analysis results,the type of first-phase excavation support measures is proposed.Through the monitoring data analysis of the construction period,it can be seen that the support method meets the design requirements.This paper presents a new excavation method with inverted arch structure for large multi-turnout regulator well,which can provide a good reference for similar projects.
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7