检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙可 SUN Ke(Shenzhen Deepwater Longhua Water Co.,Ltd.,Shenzhen 5180,China)
机构地区:[1]深圳市深水龙华水务有限公司,广东深圳518000
出 处:《中国厨卫》2023年第6期52-54,共3页Chinese Kitchen & Bathroom
摘 要:在超大型混凝土水池的建设过程中,为了提高混凝土水池的施工质量,在设计中要对止水结构进行合理的安排,同时在施工中要进行合理的处理措施,以防止施工技术等各种因素造成的不良影响。另外,还要对超大型混凝土水池中的止水结构进行全面细致的分析、总结。基于此,文章简述了防水工程施工技术概况,并分析了施工技术方案与试验结果,以期为相关工作者提供参考。In the construction process of super large concrete water tanks,in order to improve the construction quality of concrete water tanks,reasonable arrangements should be made for the water stop structure in the design,and reasonable treatment measures should be taken during construction to prevent adverse effects caused by various factors such as con-struction technology.In addition,a comprehensive and detailed analysis and summary of the water stop structure in super large concrete water tanks are also required.Based on this,a brief overview of waterproof engineering construction tech-nology is presented,and the construction technology plan and test results are analyzed to provide reference for relevant workers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.88.233