检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈重华 Chen Chonghua(China Classification Society Industrial Corp.Shenzhen Branch,Shenzhen 518000)
机构地区:[1]中国船级社实业有限公司深圳分公司,深圳518000
出 处:《设备监理》2023年第3期49-52,共4页Plant Engineering Consultants
摘 要:近年来,随着平台组块结构尺寸和重量的不断增大,常规安装方法的弊端越来越多地显现出来,因此寻找新的海上施工技术成为当前亟待解决的问题。本文针对大型组块双船浮托安装方法进行了设计,剖析了双船浮托的技术难题,并提出了相应的技术方案和结构设计,对双船浮托的整个安装作业进行了分析,为克服传统安装方法提供一定的指导。In recent years,with the increasing size and weight of platform block structure,the disadvantages of conventional installation methods are more and more obvious.Therefore,finding new offshore construction technology has become an urgent problem to be solved.In this paper,the installation method of double boat buoy with large block is designed,and the technical problems of double boat buoy are analyzed.This paper also puts forward the corresponding technical scheme and structural design,and analyzes the whole installation operation of the double boat buoy,which provides some guidance for overcoming the traditional installation method.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227