P128型PSV供应船电装施工管理及优化措施  

Electric Installation Management and Optimization Measures for the PSV Supply Ships of Type P128

在线阅读下载全文

作  者:张桂军 ZHANG Guijun(Guangzhou South China Shipyard,Guangzhou 510715)

机构地区:[1]广州华南船舶修造厂,广州510715

出  处:《广东造船》2023年第3期108-110,113,共4页Guangdong shipbuilding

摘  要:主要介绍P128型PSV供应船电装施工管理及优化措施,结合我厂在几型船建造施工过程中存在的问题,阐述电气舾装件的施工管理和优化措施。实践证明,优化后的工艺措施,对提高船舶可靠性和整体建造质量有明显效果,减少设计出错率,提升现场施工质量和生产效率。This article mainly introduces the construction management and optimization measures for the electrical outfitting of the Type P128 platform supply ship(PSV).Based on years of practical experience and theoretical research,combined with the construction problems that our factory has encountered during the construction process of several types of ships,this article provides a detailed explanation of the construction management and optimization techniques for electrical outfitting components,as well as construction optimization.Practice has proven that the improved and optimized process measures have significantly improved the reliability and overall construction quality of ships,effectively avoiding and solving these problems,reducing design error rates,and improving on-site construction quality and production efficiency.

关 键 词:PSV平台供应船 优化方案 施工管理 工艺 

分 类 号:U673.2[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象