后注浆灌注桩技术在某超高层项目中的应用  被引量:1

APPLICATION OF POST-GROUTING PILE TECHNOLOGY IN A SUPER HIGH-RISE PROJECT

在线阅读下载全文

作  者:金秀颖 Jin Xiu-ying

机构地区:[1]上海濑江建设工程有限公司,上海200333

出  处:《建筑技术开发》2023年第6期34-36,共3页Building Technology Development

摘  要:超高层建筑对基础承载力和地基变形的要求比较高,通过对盐城某超高层建筑项目的场地勘察条件和基础设计需求进行综合分析,提出采用大直径钻孔灌注桩作为项目基础方案,通过采用桩端、桩侧复合后压浆工艺来提高基桩承载力,以满足其基础承载力和基础变形要求,同时也解决了超高层塔楼与纯地下室之间差异沉降问题,并通过工程桩静载试验,为桩基设计提供依据。Super high-rise buildings have high requirements for foundation bearing capacity and foundation deformation.Through comprehensive analysis of the site survey conditions and foundation design requirements of a super high-rise building project in Yancheng,this paper proposes to adopt large-diameter bored pile as the project foundation scheme,and improve the bearing capacity of the foundation pile by adopting the pile end and pile side composite post-grouting technology to meet its foundation bearing capacity and foundation deformation requirements,At the same time,it also solves the differential settlement problem between the super high-rise tower and the pure basement,and provides the basis for the pile foundation design through the engineering pile static load test.

关 键 词:岩土勘察 混凝土灌注桩 后注浆灌注桩 单桩承载力 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象