综合楼工程土建施工桩基技术分析  被引量:1

TECHNICAL ANALYSIS OF PILE FOUNDATION FOR CIVIL CONSTRUCTION OF COMPREHENSIVE BUILDING PROJECT

在线阅读下载全文

作  者:兰俊 徐涛 李鑫 唐小钧 Lan Jun;Xu Tao;Li Xin;Tang Xiao-jun

机构地区:[1]中建二局第一建筑工程有限公司,北京100176

出  处:《建筑技术开发》2023年第6期145-147,共3页Building Technology Development

摘  要:新疆阜康市某综合办公楼的工程地质环境由深层冻土和戈壁滩组成,项目采用旋挖钻孔灌注桩施工工艺。研究过程分析了工程难点,包括冻土融沉影响桩体标高控制,松散土层易导致孔壁坍孔,在其基础上全面总结了灌注桩各主要工序的技术要点,提出针对难点问题的技术对策,对同类地质条件下的钻孔施工、孔壁保护等产生了一定的借鉴价值。The engineering geological environment of a comprehensive office building in Fukang City,Xinjiang Province is composed of deep frozen soil and Gobi desert.The project adopts the construction technology of rotary bored pile.The research process analyzes the engineering difficulties,including the influence of permafrost thawing settlement on pile elevation control,loose soil layer is easy to cause hole wall collapse,on the basis of the comprehensive summary of the main technical points of each process of the pile,put forward the technical countermeasures to solve the difficult problems,has a certain reference value for drilling construction and hole wall protection under the same geological conditions.

关 键 词:综合楼工程 桩基 土建施工 

分 类 号:TU753.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象