检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张亮 ZHANG Liang(China 19th Metallurgical Group Corporation Limited,Nanjing,Jiangsu,210039,China)
机构地区:[1]中国十九冶集团有限公司,江苏南京210039
出 处:《工程建设(维泽科技)》2023年第8期167-170,共4页Engineering Construction
摘 要:为解决旋流池工程施工中地质条件、施工环节对相关作业安全及质量的干扰影响问题,文中对旋流池工程施工中止水帷幕与桩支护逆筑法的技术要点进行分析和阐述,进一步探究止水帷幕与桩支护逆筑法应用可行性,并提出施工期间注意事项,从根本上保障旋流池工程施工质量,以期为相关工程建设提供参考。In order to address the interference and impact of geological conditions and construction processes on the safety and quality of related operations in the construction of a vortex pool project,the technical points of the water stop curtain and pile support reverse construction method in the construction of a vortex pool project are analyzed and elaborated in the article.The feasibility of the application of the water stop curtain and pile support reverse construction method is further explored,and precautions during construction are proposed to fundamentally ensure the construction quality of the vortex pool project,so as to provide reference for relevant engineering construction.
关 键 词:止水帷幕 桩支护逆筑法 旋流池工程 高压旋喷桩 质量控制
分 类 号:TU273.3[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222