检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏敏 黄金豪 朱智颖[1] 欧阳灿[1] WEI Min;HUANG Jin-hao;ZHU Zhi-ying;OU Yang-can
机构地区:[1]长沙有色冶金设计研究院有限公司,湖南长沙410019
出 处:《有色设备》2023年第3期74-78,共5页Nonferrous Metallurgical Equipment
摘 要:某铜冶炼厂制酸系统转化工段阻力过大,导致二氧化硫浓度难以提升,风机逼近额定最大功率,增加了运行成本,严重制约了系统的产能提升。通过对转化工段转化器及换热器进出口压力进行测量,发现五台碟环式换热器壳程运行阻力均大大超过了设计值。针对该问题,采用CFD流体模拟软件Fluent对Ⅰ~Ⅴ号换热器建立了壳程流体域模型,计算其阻力分布,并在原始结构的基础上,通过改造进气口结构,一定程度上减小了换热器壳程的压力损失。The resistance of the conversion section of the acid production system in a smelter is too large,result the SO2 concentration difficult to increase,and the fan approaches the rated maximum power,which increases the operation cost and seriously restricts the capacity improvement of the system.By measuring the inlet and outlet pressure of the converter and heat exchanger in the conversion section,it is found that the shell side resistance of the five dish ring heat exchangers greatly exceeds the design value.To solve this problem,the CFD fluid simulation software Fluent was used to establish the shell side fluid domain model of No.Ⅰ-Ⅴheat exchanger,and the resistance distribution was calculated.Based on the original structure,the pressure loss of the shell side of heat exchanger was reduced to a certain extent by modifying the inlet structure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.24.23