检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高英 徐伟 王燕玲 闻昕[2] GAO Ying;XU Wei;WANG Yan-ling;WEN Xin(Hydropower Station Remote Centralized Control Center of Guizhou Wujiang Hydropower Development,Guiyang 550002,China;College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China)
机构地区:[1]贵州乌江水电开发有限责任公司水电站远程集控中心,贵州贵阳550002 [2]河海大学水利水电学院,江苏南京210024
出 处:《水电能源科学》2023年第6期197-201,共5页Water Resources and Power
摘 要:针对水电站调度运行面临的大容量、大机组、机组不规则多限制区控制等新的调度特点和更为复杂的运行需求,以电站安全、稳定、经济运行为目标,建立站内经济运行模型,实现水电站在各运行工况下机组间负荷的最优分配。分析了不同水头下各机组的最优出力范围,研究了电站负荷优化分配规则,建立了站内经济运行模型。在站内经济运行模型的基础上设计负荷最优分配表,提出不同负荷、不同水头、不同开停机组合下,电站的负荷最优分配成果表,以指导电站站内经济运行实时调度。在洪家渡电站的应用表明,优化模型能根据实时负荷指令,合理安排机组启停次序、开机台数,并实时给出机组的启停机建议。能够获得各工况下机组的最优负荷分配组合,降低月平均耗水率0.18%,减少机组频繁启停、频繁穿越振动区等不利工况9.5%,保证机组高效运行,提高电站经济效益。Dispatching operation of hydropower station is in face of the large capacity and large units,unit control new scheduling features such as irregular more limits and more complicated operation requirements.To aim at power sta-tion safe,stable and economic operation,a model of economic operation inside the station was established to realize opti-mal load distribution of hydropower station units under various operation conditions.The optimal output range of each u-nit under different head was analyzed.The optimal load distribution rule of the power station was studied,and the eco-nomic operation model of the station was established.Based on the economic operation model of the station,the optimal load distribution table was designed.The optimal load distribution result table of the power station under different loads,different heads,and different unit commitment was proposed to guide the real-time economic scheduling of the power sta-tion.Taking Hongjiadu station as an example,the results show that the model can reasonably arrange the start-stop se-quence and number of units according to the real-time load instruction,and give real-time start-stop suggestions of units.It can obtain the optimal load distribution combination of the proposed unit under various working conditions,reduce the monthly average water consumption rate by 0.18%,reduce the adverse working conditions such as frequent start-stop and frequent crossing of the vibration zone by 9.5%,ensure the efficiency of the unit operation,and improve the econom-ic benefits of the power station.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15