检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡彦枫 徐初琪 汤东升 王晴勤 CAI Yanfeng;XU Chuqi;TANG Dongsheng;WANG Qingqin(China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510663,Guangdong,China;Guangdong Kenuo Surveying Engineering Co.,Ltd.,Guangzhou 510663,Guangdong,China;Xiamen Sunrui Ship Coating Co.,Ltd.,China Shipbuilding Industry Corporation,Xiamen 361101,Fujian,China)
机构地区:[1]中国能源建设集团广东省电力设计研究院有限公司,广东广州510663 [2]广东科诺勘测工程有限公司,广东广州510663 [3]中国船舶重工集团厦门双瑞船舶涂料有限公司,福建厦门361101
出 处:《南方能源建设》2023年第4期138-147,共10页Southern Energy Construction
基 金:中国能建广东院科技项目“大规模海上风电场细分场址及容量控制指标研究”(EV06731W);中国电力工程顾问集团有限公司科技项目“广东省海上风电海洋水文气象信息预报关键技术研究”(GSKJ2-W01-2021)。
摘 要:[目的]文章旨在研究大型海上风电场的最佳规划容量设置。[方法]针对某1 GW容量的单个规划场址,利用3种不同单机容量机型与3种海上风电场尾流模型,结合海上风资源图谱开展同场址逐步扩容至2GW的一系列数值试验,并对全场发电量、尾流影响与边际效应进行分析。[结果]结果显示,随着机型的单机容量增大,扩容过程中全场实际发电量增幅越高,尾流损失增长越慢,兼顾机组安全性与投入产出比的有效扩容区间越大;但尾流模型选择可能影响有效扩容区间评估结果。[结论]文章研究表明,在满足现有用海指标、风电机组安全性与工程经济性等多重约束下,单个场址的最佳规划容量可以略高于现有基准值,在今后海上风电千万千瓦级基地规划中,应科学细分并合理设置单个场址的规划容量。[Introduction]This article aims to study the optimal planned capacity setting of large-scale offshore wind farm.[Method]A series of numerical experiments were conducted on a single planned site with a capacity of 1 GW using three models with different unit capacities and three offshore wind farm wake models,combined with an offshore wind resource atlas,to gradually expand it to 2 GW.Power generation,wake effects and marginal utility of the whole site were analyzed.[Result]The results show that employing the wind turbine with larger single-unit capacity,the higher gaining of the power generation and slower growth of wake loss appear during the capacity expansion.Meanwhile,the larger effective expansion range which taking into account the safety of the wind turbine and the marginal utility exists.However,evaluation of effective expansion range may be affected by wake model selection.[Conclusion]This article shows that the optimal planned capacity of a single offshore wind farm can be slightly higher than the existing benchmark when multiple constraints,such as utilization of sea area,wind turbine safety and economical efficiency are met.Individual site needs to be subdivided scientifically and the optimal planned capacity should be reasonably set in the future planning of offshore wind farm bases with capacities in the tens of millions of kilowatts.
分 类 号:TK89[动力工程及工程热物理—流体机械及工程] TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.52.101