检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钱昆仑 张汉辰 张维江[1] QIAN Kun-lun;ZHANG Han-chen;ZHANG Wei-jiang(Civil and Water Conservancy Engineering,Ningxia University,Yinchuan 750021,Ningxia,China;School of Geography and Planning,Ningxia University,Yinchuan 750021,Ningxia,China)
机构地区:[1]宁夏大学土木与水利工程学院,宁夏银川750021 [2]宁夏大学地理科学与规划学院,宁夏银川750021
出 处:《中国农村水利水电》2023年第7期132-138,共7页China Rural Water and Hydropower
基 金:宁夏自然科学基金项目(2021AAC03033);宁夏自治区重点研发计划项目(引才专项)(2020BEB04027)。
摘 要:截流缓释生态坝是结合生物措施和工程措施对小型淤地坝改良后的水土保持措施。为了揭示改良后的水土保持措施对小流域径流的影响,为淤地坝新的发展提供借鉴,以骆驼林流域为研究对象,构建流域CASC2D-SED模型,以实测降雨径流资料进行参数率定及验证,通过实地勘察、试验确定工程建设后下垫面情况的变化,将工程与模型进行耦合,比较工程建设前后流域径流实测模拟对比分析,并结合流域径流量与径流系数的计算分析,确定工程对流域径流的影响。率定期模型确定性系数均在0.7以上,洪峰相对误差绝对值在20%以内,拟合度良好;工程建设后,流域径流量和径流系数均明显增加,径流系数增加3.5%左右;工程能够有效削减洪峰,减少洪峰流量30%左右。截流缓释生态工程能够显著地增加流域径流系数,并可以起消减洪峰的作用。Construction standard of water and soil conservation project in the mountainous area of South Ningxia is low,the aging of the project is serious,and the utilization efficiency of local water resources is low.In order to solve this problem,a closure and slow-release ecological system has been built locally.The closure and slow-release ecological system is composed of a series of closure and slow-release ecological dams arranged reasonably in space.The closure and slow-release ecological dam is a water and soil conservation measure for improving small silt dams.Its main biological and engineering measures have synergistic effects on watershed hydrology.In order to reveal the impact of closure and slow-release ecological system on the runoff of small watersheds and provide a reference for the new development of the silt dam in the future,CASC2D-SED model of the watershed is constructed by taking camel forest watershed as the research object,the parameters are calibrated and verified based on measured rainfall-runoff data,the changes of underlying surface conditions after the project is completed are determined by field investigation and test,and these conditions are substituted into the model to couple the project with the model.By comparing the measured and simulated comparison and analysis of runoff before and after the project construction,and combining the calculation and analysis of runoff with runoff coefficient of the river basin,the influence of the project on the river basin runoff is determined.After the model is built,the deterministic coefficient of the rate periodicity and verification period are above 0.7,the absolute value of relative error of flood peak is within 20%,and the fitting degree is good.According to the calculation and analysis of runoff and runoff coefficient of the river basin,after the construction of the project,the runoff and runoff coefficient of the river basin have increased significantly,and the runoff coefficient has increased by about 3.5%.The basin model is used to simulate the
关 键 词:水土保持 淤地坝 CASC2D-SED 径流系数 洪峰流量
分 类 号:TV91[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.131.95.159