检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈磊 阿发友 潘万成 李青炜 沈显泽 CHEN Lei;A Fa-you;PAN Wan-cheng;LI Qing-wei;SHEN Xian-ze(Kunming Prospecting Design Institute Of China Nonferrous Metals Industry Co.,Ltd,Kunming 650051,China;Faculty of Land Resource Engineering,Kunming University of Science and Technology,Kunming6650093,China;Key Laboratory of Geohazard Forecast and Geoecological Restoration in Plateau Mountainous Area,Ministry of Natural Resources of the Peoples Republic of China,Kunming 650093,China;Wuhan Survey-geotechnical Research Institute of China Metallurgical Science and Industry Group Co.LTD,Wuhan 430080,China)
机构地区:[1]中国有色金属工业昆明勘察设计研究院有限公司,昆明650051 [2]昆明理工大学国土资源工程学院,昆明650093 [3]自然资源部高原山地地质灾害预报预警与生态保护修复重点实验室,昆明650093 [4]中冶集团武汉勘察研究院有限公司,武汉430080
出 处:《地质灾害与环境保护》2023年第2期28-34,共7页Journal of Geological Hazards and Environment Preservation
基 金:国家自然科学基金地区科学基金项目(42267020);云南省应用基础研究计划面上项目(2017FB070)。
摘 要:云南省个旧重金属污染整治示范试验区建设过程中,由于场地开挖平整形成高陡岩质边坡,严重影响场区建设和运营安全。因此,需要对其进行稳定性分析,并提出相应的防治措施,为边坡永久治理提供依据。通过理正极限平衡法、Geostudio和FLAC3D数值模拟综合判定,天然工况下边坡整体稳定性均处于稳定状态,在暴雨工况和地震工况下边坡整体稳定性均呈不稳定状态。依据稳定性计算结果,将边坡防治划分为3个防治区段:重点防治区,主要防治措施为锚索框格梁+被动防护网;次重点防治区,主要防治措施为清危+框格锚杆;一般防治区,主要防治措施为清危+被动防护网,为边坡永久治理提供了依据。Yunnan province plans to build a demonstration and experimental zone for the treatment of heavy metal pollution in these old areas,and build,discharge and manage the small selection plants with small scale,low productivity and disorderly emissions that have been formed over the years.During the construction of the test area,the high and steep rock slope was formed due to the smooth excavation of the site,which seriously affected the construction and operation safety of the site.Therefore,it is necessary to analyze the stability of the slope and put forward the corresponding prevention and control measures,so as to provide a basis for the permanent treatment of the slope.According to the comprehensive judgment of the limit equilibrium method and the numerical simulation method,the overall stability of the slope is in a stable state under the natural condition,and the overall stability of the slope is in an unstable state under the rainstorm condition and the earthquake condition.According to the stability calculation results,the slope prevention and control is divided into three sections:the key prevention and control area,the main prevention and control measures are the anchor cable frame grid and passive protection net;Secondary key prevention and control area,the main prevention and control measures are clear dangerous and frame lattice bolt;General prevention and control areas,the main prevention and control measures for the clear dangerous and passive protection network.
分 类 号:P649[天文地球—地质矿产勘探] TU457[天文地球—地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.36.171