作 者:谢毓广 李金中 王川 高博 郑天文 梅生伟[2] XIE Yuguang;LI Jinzhong;WANG Chuan;GAO Bo;ZHENG Tianwen;MEI Shengwei(State Grid Anhui Electric Power Research Institute,Hefei 230601,China;Department of Electrical Engineering,Tsinghua University,Beijing 100084,China;Sichuan Energy Internet Research Institute,Tsinghua University,Chengdu 610213,China)
机构地区:[1]国网安徽省电力有限公司电力科学研究院,安徽合肥230601 [2]清华大学电机工程与应用电子技术系,北京100084 [3]清华四川能源互联网研究院,四川成都610213
出 处:《电力自动化设备》2023年第7期51-57,72,共8页Electric Power Automation Equipment
基 金:国家自然科学基金资助项目(52007100);国网安徽省电力有限公司科技项目(52120520004M)。
摘 要:随着以风光为代表的可再生能源发电比例迅速提升,风电场、光伏电站出力的不确定性和波动性给电力实时平衡带来了极大的挑战,配置合理规模的储能可以保障经济性并提高新能源利用率。为此,针对容量已知的新能源电站,提出了一种配套储能和传输线路容量协调优化配置的机会约束规划模型,以储能和传输线路建设成本最小化为目标,以年新能源弃电率不超过规定的指标为机会约束。由于机会约束非凸且缺乏显式表达,基于条件风险价值将机会约束对应的可行域保守转换为线性约束,得到易于求解的线性规划问题,并量化分析了规划方案对新能源场景概率分布的鲁棒性。算例分析结果表明,所提规划模型可以有效地解决考虑新能源消纳能力的储能和传输线路容量配置问题,通过合理配置储能可以降低传输线路的容量从而节约总投资成本。With the rapid increase of the proportion of renewable energy power generation represented by wind and photovoltaic power,the uncertainty and volatility of the output of wind farms and photovoltaic power plants pose great challenges to the real-time power balance.The configuration of energy storage with reasonable scale can guarantee the economy and improve the utilization rate of new energy.Therefore,aiming at the new energy power station with known capacity,a chance-constrained programming model for coordinated optimal capacity configuration of energy storage equipped by new energy and transmission lines is proposed,which aims to minimize the construction cost of energy storage and transmission lines,and takes the annual new energy abandonment rate not exceeding the specified index as the chance constraints.Since the chance constraints are usually non-convex and lack explicit expressions,the feasible domain corresponding to the chance constraints is conservatively converted into linear constraints based on conditional value at risk to obtain a linear programming problem which can be efficiently solved,and the robustness of the programming scheme to the probability distribution of new energy scenarios is quantitatively analyzed.The example analysis results show that the proposed programming model can effectively solve the capacity configuration problem of energy storage and transmission lines considering the consumption level of new energy,and the capacity of transmission lines can be reduced by rational configuration of energy storage,thus saving the total investment cost.
关 键 词:新能源 储能 容量配置 条件风险价值 机会约束规划 协调优化
分 类 号:TM732[电气工程—电力系统及自动化]