抽水蓄能工程基建期安全管控中心构建  

Establishment of Safety Control Center in the Construction Period of Pumped Storage Project

在线阅读下载全文

作  者:袁祥 秦鸿哲 刘杨 张帆 崔锴 YUAN Xiang;QIN Hongzhe;LIU Yang;ZHANG Fan;CUI Kai(Shanxi Zhen’an Pumped Storage Co.,Ltd.,Xi’an 710061)

机构地区:[1]陕西镇安抽水蓄能有限公司,陕西西安710061

出  处:《电力安全技术》2023年第6期8-11,共4页Electric Safety Technology

摘  要:针对抽蓄工程建设现场安全监督管控难度大的问题,基于视频监控系统、人员定位系统、门禁系统、车辆测速系统等模块的有机融合,构建了电站基建期安全管控中心;同时通过监督工作机制、标准化工作流程等的建立,实现了对施工现场全天候、全方位、全过程的集中安全监管,有效提升了工程施工风险的管控水平。In view of the difficult problem of safety supervision and control at the construction site of the storage project,based on the organic integration of video monitoring system,personnel positioning system,access control system,vehicle speed measurement system and other modules,the power station infrastructure safety management and control center has been built;At the same time,through the establishment of supervision of working mechanisms and standardized workflows,it realizes the all-weather,all-round and whole-process centralized safety supervision of the construction site,and effectively improves the management and control level of project construction risks.

关 键 词:抽水蓄能 基建期 安全管控中心 风险管控 

分 类 号:TM08[电气工程—电工理论与新技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象