检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙伟[1] 程成[1] 赵谦[1] SUN Wei;CHENG Cheng;ZHAO Qian(Guodian Nanjing Automation Co.,Ltd.,Nanjing 210003,China)
机构地区:[1]国电南京自动化股份有限公司,江苏南京210003
出 处:《电工技术》2023年第10期104-107,共4页Electric Engineering
摘 要:针对海上风电模块化建设和运维高要求,对高压断路操作箱回路复杂、抗干扰能力弱、防护等级低等不足开展改进工作,主要设计改进工作包括简化操作回路、利用抗工频大功率继电器回路提升抗干扰能力、实施IP67无防护安装改造、对外采用航空插头支持即插即用等,同时提出了针对海上风电模块化建设的安装方案、一/二次融合模块化安装方案,可适应于海上风电新项目及传统变电站项目。In view of the high requirements of modular construction and operation and maintenance of offshore wind power,the improvement work has been carried out on the shortcomings of the high-voltage circuit breaker operation box circuit,weak anti-interference ability and low protection level.The main design improvement work includes simplifying the operation circuit,using the anti-power frequency high-power relay circuit to improve the anti-interference ability,implementing IP67 unprotected installation and transformation,and supporting plug-and-play with aviation plugs.At the same time,the installation scheme and the first/secondary integration modular installation scheme for the modular construction of offshore wind power are proposed,which can be adapted to new offshore wind power projects and traditional substation projects.
分 类 号:TN915[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171