检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯军 HOU Jun(China Railway 14th Bureau Group No.3 Engineering Company Limited,Ji'nan 250000,China)
机构地区:[1]中铁十四局集团第三工程有限公司,济南250000
出 处:《价值工程》2023年第19期78-81,共4页Value Engineering
摘 要:大跨度高墩预应力盖梁施工支撑难度大,施加预应力技术要求高。本文结合莆炎高速公路承福亭1号大桥高墩大跨度预应力盖梁工程实践,从支架方案选择、施工工艺等方面对大跨度预应力盖梁施工技术进行探讨,取得了良好的施工效果,对类似工程具有一定的借鉴意义。The construction of high pier and long-span prestressed capping beam is difficult to support,and the technical requirement of prestressing is high.Combined with the engineering practice of high pier and large span prestressed capping beam of No.1 Bridge in Chengfuting of Puyan Expressway,the construction technology of large span prestressed capping beam is discussed from the selection of support scheme and construction technology,etc.Good construction effect has been obtained,which has certain reference significance to similar projects.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.28.190