急倾斜薄矿脉机械化采矿方案优选及应用  被引量:2

Optimization and Application of Mechanized Mining Scheme for Steeply Inclined Thin Vein

在线阅读下载全文

作  者:姚泽春 杨红军 刘盛 蔡建华 YAO Zechun;YANG Hongjun;LIU Sheng;CAI Jianhua(Hunan Chenzhou Mining Co.,Ltd.)

机构地区:[1]湖南辰州矿业有限责任公司

出  处:《现代矿业》2023年第6期129-132,共4页Modern Mining

摘  要:急倾斜薄矿脉在推进机械化采矿时,由于矿脉薄、储量小,采用常规脉外斜坡道作为设备进出通道,存在采准时间长、采切比过大的问题。针对急倾斜薄矿脉初选了4种技术上可行的采矿方法,重点对比了脉内和脉外斜坡道采准的上向分层充填法的技术经济指标。脉外斜坡道采准下的采场生产能力是脉内斜坡道下的2倍,但采切比也增大近3倍;脉内斜坡道上向分层充填法的生产能力较小,但也接近100 t/d,能满足矿山产能要求。经工业试验,脉内斜坡道上向分层充填法采场生产能力达到97.2 t/d,采切比控制在8.5 m/kt,采矿综合成本98.2元/t,达到预期效果。In the process of mechanized mining of steeply inclined thin veins,due to the thin veins and small reserves,the conventional out-vein ramp is used as the inlet and outlet channel of equipment,which has the problems of long mining preparation time and large mining-cuting ratio.Four technically feasible mining methods were selected for the steeply inclined thin vein,and the technical and economic indexes of the upward layered filling method for the in-vein and out-vein ramp mining were compared.The production capacity of the stope under the out-vein ramp is 2 times that under the in-vein ramp,but the mining ratio is also increased by nearly 3 times.The production capacity of the in-vein ramp upward layered filling method is small,but it is also close to 100 t/d,which can meet the mine production capacity requirements.The industrial test shows that the production capacity of the stope with the upward layered filling method of the in-vein ramp reaches 97.2 t/d,the mining-cutting ratio is controlled at 8.5 m/kt,and the comprehensive mining cost is 98.2 yuan/t,which achieves the expected results.

关 键 词:急倾斜薄矿脉 机械化开采 脉内斜坡道 采切比 

分 类 号:TD853[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象