检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯文豪 傅裕 孙浩 韩文轩 俞迦楠 HOU Wenhao;FU Yu;SUN Hao;HAN Wenxuan;YU Jianan(China Nuclear Power Operation Management Co.,Ltd.,Haiyan 314300,China)
机构地区:[1]中核核电运行管理有限公司,浙江海盐314300
出 处:《电工技术》2023年第11期225-227,共3页Electric Engineering
摘 要:介绍了一起某核电厂汽轮发电机转子返回制造厂后初测转子绕组直流电阻超标的事件,通过原因分析和相关试验排除了转子绕组匝间短路的可能,并经复测验证了分析的正确性。对此提出了直流电阻测量方面的相关建议,同时对转子直流电阻的各类标准进行了探讨,为同类问题的处理提供了借鉴。An event that the DC resistance of the initial measured rotor winding exceeds the standard after the turbine generator rotator in a nuclear power plant returns to the manufacturer is introduced.The possibility of inter-turn short-circuit of the rotor windings is excluded by reason analysis and related tests,and the correctness of the analysis is verified by repeated measurements.Suggestions on DC resistance measurement are given.At the same time,various standards for DC resistance of rotors are discussed,which can be used as reference for the treatment of similar problems.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.12